Starting the work of the second stage of the Al-Kafeel Garage Project

The staffs of the Engineering Projects Department at the Al-Abbas's (p) holy shrine have started implementing the second phase of the Al-Kafeel Technical Garage Project.

The engineer of the project, Hussein Mohammed Baqer, said that "the staff of the department has started the work of the second stage of the Al-Kafeel Technical Garage, and included equipping the workshops with the equipment allocated to them in advance".

He added that" the garage of Block (F) has been created for large and small car washing workshops, as well as equipped with the best international equipment, "indicating that "the area of one workshop is (4.260 m2) and contains service and administrative rooms, in addition to storage rooms for spare materials."

"The infrastructure works of the workshop, the foundations and the iron structure of the columns, roofs and bridges of the workshop have been completed, in addition to the covering works with (sandwich panel) coated with fireproof paint for ceilings and external walls," Baqer explained.

He stressed that "the completion rates reached more than 50%, as the external infrastructure works surrounding the workshop were started, including sewage and rainwater drainage works".
Readers' comments
No comment
Add a comment
Name:
The country:
Email:
Share: